Project Owner | Description |
Pepsi Co. Factory Dammam 2nd Industrial Area | Surface Preparation, Ucrete Self Levelling, PU Polyurethane Coating |
Doha poultry farms | Asphal Doha poultry farmst work the way the Doha poultry farms |
Al-Omar Group | Roads Construction work Plan No. 854/3 |
Isam Company | Airbase, warehouse roof, polyurea |
Development Works Co. | Network lowering the water table, King Fahd Medical |
ISD KABANI company Haded job | Roof Polyurea |
Abdul Rahman Ali Turki Trading & Contracting Est. (Atco) | WASIT Gas Plant – Jubail – Roads Construction |
Networks & System Integration Saudi Arabia Co. Ltd. “NESIC SA” | Haradh Gas Increment Program Package 14 |
Consolidated Contractors Co. | WASIT Gas Plant – Jubail – Roads Construction |
Saudi Diesel Equipment Company | Roads Construction and maintenance work Plan No. 1185 |
Ministry of Water and Electricity | Deport line carrier for housing displaced by objecting the road of Abu Arish, Al- Areda in Jazan |
Eastern Municipality | The development of King Fahd suburb in Qatif project |
Ministry of Water and Electricity | Deportation of water lines and sewage project Alkrpos in Jazan |
Eastern Municipality | Development of intersections and main roads in Qatif project |
Sadara | CRES – IKK Group Jubail | Chemical Tank Coating (BASF Polyureane) |
Yenigun Construction Industry & comm. Inc., Taif & Nesma & Partners | For horizontal application of waterproofing system using EPDM membrane 1.52mm thick black unreinforced black, a separation sheet of non-woven geotextile 200g/m2 density For vertical application using EPDM membrane reinforced black, HDPE liner 1mm thick, aluminum fastening strip of 30mm wide to be mechanically fix at the juncture for vertical and horizontal surface. |